Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13603683

- Product Categories
- Friendly Links
Information Name: | Cement poles plant, Kyushu Electric Power Tower (certified), cement poles |
Published: | 2014-11-13 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Cement poles plant, Kyushu Electric Power Tower (certified), cement poles provided by the Henan Kyushu Electric Power Tower LLC. Henan Kyushu Electric Power Tower LLC (www.hnganta.com) is specialized in the "transmission line steel tube tower, reinforced concrete cement poles, power tower" of the enterprise, the company adhering to the "honesty, hard service" concept, to provide you The most high-quality products and services. Welcome to inquire! Contact: Manager Zhou. Production of cement poles at a certain speed (generate enough centrifugal force cement poles, so that the material forming the intermediate empty cement poles) is made of steel with steam curing. Synthesis of the two steel half-molds in order to feed and remove the product. Therefore, before forming the need for wire rod rebar (steel cage) in the production of cement slurry mix and meet the required ratio (cement + gravel + sand + water) was stirred, so its manufacturing production principle is simple, but requires a certain degree of lifting equipment, facilities and certain machinery and equipment. Must be positioned in a real place, not given in the mud, Hekan. Although these places are sometimes buried very deep, but the mud pressure is less than 12 meters covering cement poles price, failing to meet required specifications Rally cement poles, cable pit backfill soil must be real, not be mud, not perishable Pull real debris filled the pit, to avoid causing insufficient pressure, pull the tray to climb shift. 4 Pull Rod mounting plate is pulled out from the direction of pull should correspond to the wire, but when you pull the disc tray to pull the plane to be buried with the pull rod vertically, connecting rod and wire cable tray should use the double nut. Buried cable tray cable pit should landslide (Ma), cable pit, pole pit backfill should reinforce once every 0.3m, the last train out to be 0.3 ~ 0.5m above the ground anti-settling earth station, in Pull vulnerable to floods and erosion of local pole should be set to protect the pile. |
Admin>>>
You are the 37782 visitor
Copyright © GuangDong ICP No. 10089450, Henan Kyushu Electric Power Co., Ltd. Tower All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 37782 visitor
Copyright © GuangDong ICP No. 10089450, Henan Kyushu Electric Power Co., Ltd. Tower All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility