Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13603683

- Product Categories
- Friendly Links
- home > Supply > The price of cement pole _ Kyushu Electric Power Tower (certified) _ Jiangsu cement pole
Information Name: | The price of cement pole _ Kyushu Electric Power Tower (certified) _ Jiangsu cement pole |
Published: | 2014-11-26 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | The price of cement pole _ Kyushu Electric Power Tower (certified) _ Henan, Jiangsu cement poles provided by Kyushu Electric Power Co. tower. Kyushu Electric Power Co., Ltd., Henan tower company (www.hnganta.com) is specialized in the "transmission line steel tower, reinforced concrete cement poles, power tower" of the enterprise, the company of "honesty, hard service" concept, to provide you with The most high-quality products and services. Welcome to inquire! Contact: Manager Zhou. Cement poles pull the poles to pull the disc tray choose how to select, in the majority of our cement poles to be used to pull the disc in the cement pole terminal need to play corner or cable, the cable needs to be connected on the cable tray. Hengli cable tray specifications, LP60, LP80 cement pole parameters, LP100, LP120, LP140. Other models, how to use the cable tray, rural power grids in our country at the same time, rural areas need to fight the corner of the circuit construction of the cable. 8 m 60 Drawers use utility poles, cement poles 10 meters using 80 cable tray, 12 m concrete poles 100 cable tray, 15 m cement pole using 120 Drawers, 18 m cement poles using 120 Drawers, 21 m cement poles using 140 Drawers. Use in accordance with this ratio. Must be positioned in a real place, not given in the mud, Hekan. Although these places are sometimes buried very deep, but the lack of pressure on the soil cover, mainly the tension, the cable must be real pit backfill soil, silt, debris perishable untrue shall be filled with cement pit electrical cable rod life, to avoid causing insufficient pressure Buying cement poles, pull the disc to climb shift. 4 cable installation disc pull pull pull rod from the direction you want to correspond with the cable, while pulling the disc tray to pull the plane to be buried with the pull rod vertically, connecting rod and wire cable tray should use double nut. Buried cable tray should pull pit landslide (Ma) cement poles, cable pit, pole pit backfill should be compacted once every 0.3m, the last train out to be 0.3 ~ 0.5m above the ground of anti-settling earth station, cable and poles in flood-prone areas erosion, should be set up to protect the pile. |
Admin>>>
You are the 37782 visitor
Copyright © GuangDong ICP No. 10089450, Henan Kyushu Electric Power Co., Ltd. Tower All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 37782 visitor
Copyright © GuangDong ICP No. 10089450, Henan Kyushu Electric Power Co., Ltd. Tower All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility